- Fast & global delivery
- Packaging Manufacturer Since 2005
Quality standards
Quality Standards and Work Instructions
The written standards our QC team works to, from incoming film to the release of finished bags. Open any document to see its scope and key limits, then download the PDF for your supplier records.
19documents, each with its own page
4parts of our quality system
1:1one page, one downloadable PDF
ISOissued under our ISO 9001 system
01 · 6 documents
Finished-Bag Inspection and Lab Tests
How every batch is tested before release, and the methods our lab uses.
Finished Bag Inspection Standard
The checks, limits and methods every batch of finished bags must pass before it can leave the factory, including heat seal strength of at least 7 N/15 mm.
View document →Peel Strength Test Method
How our lab measures the bond (peel) strength between laminate layers: T-peel on a 15 mm strip at 300 ± 50 mm/min on a universal testing machine.
View document →Right-Angle Tear Strength Test Method
How our lab tests the right-angle tear strength of film and laminate on a universal testing machine: specimen, settings, clamping and recording.
View document →Seal and Leak Test Method
How our lab checks finished bags for air and water leaks: sample bags from each work order, a vacuum seal tester at −80 kPa for 80 seconds, and a water-filled leak check.
View document →Drop Test Method for Filled Bags
How filled bags are drop tested: 5 random samples per batch, filled to their labelled weight, dropped on six sides and four corners from 300–800 mm depending on weight, with no rupture allowed.
View document →Tensile Strength Test Method
How our lab measures the tensile strength of film and bag material on a universal testing machine: 15 mm strips, 50 mm gauge length, 300 ± 10 mm/min, maximum force recorded.
View document →
02 · 7 documents
Incoming Material Control
What film and materials must pass before they reach the press.
Incoming Material Inspection Standard
How film and auxiliary materials are received, quarantined, sampled and tested before they can be used, with thickness, tensile and elongation limits for PE, CPP, BOPP and BOPA film.
View document →IQC Incoming Quality Control Standard
The receiving checklist for film, PE sealant film, gravure cylinders, cartons, adhesive, ink and thinner, including RoHS and REACH document checks and PE tensile minimums by thickness.
View document →BOPP Film Incoming Inspection Standard
Sampling plan (GB/T 2828, AQL 6.5), dimensional and appearance limits, and physical properties for incoming BOPP film, with acceptance and re-test rules.
View document →CPP Film Incoming Inspection Standard
How we sample and judge incoming CPP sealant film by grade (general, metallizing, general cooking and high-temperature cooking): AQL 6.5 sampling, thickness and width tolerances, fish-eye limits and physical properties.
View document →CPE and CPP Film Incoming Inspection Standard
Incoming inspection of cast PE (CPE) and cast PP (CPP) sealant films: AQL 6.5 sampling, width and thickness tolerances, joint limits, and tensile, elongation, haze and friction requirements by thickness.
View document →PE Film Incoming Inspection Standard
Incoming inspection of PE film (LDPE, LLDPE, MDPE, HDPE and blends): sampling plan, width and thickness tolerances, splice limits, and transverse tensile strength and elongation by PE type.
View document →PET Film Incoming Inspection Standard
Incoming inspection of PET printing film: sampling plan, ±2 mm width and ±10% thickness, splice limits by thickness, and tensile, shrinkage, haze, gloss, friction and surface tension requirements.
View document →
03 · 5 documents
Production Process Control
How printing, slitting, bag making, maintenance and the warehouse are run.
Gravure Printing Work Instruction
Process control on the gravure press, from checking materials and corona treatment, through first-sample sign-off, to comparing every new roll with the approved sample.
View document →Slitting Work Instruction for Roll Film
How laminated film is slit into finished rolls: setup checks, tracking and tension, defect removal at marked points, pattern-aligned splices and roll labelling.
View document →Bag Making Work Instruction
How our bag-making lines are set up, run and checked: specification review, machine checks, waste-film setup, seal temperature checks at every corner, and seal, size and position inspection.
View document →Equipment Maintenance Work Instruction
Who maintains our production machines, how often, and how breakdowns are reported, repaired and test-run before a machine returns to production.
View document →Warehouse Operation Instruction
How materials and goods are received, quarantined, stored, counted and issued: quarantine until QC passes, first in first out, and a monthly stock count with finance.
View document →
04 · 1 document
Quality Performance
Our quality targets and the results we recorded.
i
Internal standards, not certificatesThese documents show how we work. For independent evidence, see our certifications and third-party test reports and our quality control process.
FAQ
Questions About These Documents
Are these third-party certifications?
No. These are YLTPACK internal standards and work instructions, issued under our ISO 9001 quality management system and reproduced in English for customers. Independent lab reports and certificates are listed on our certifications page.
Can I download the documents?
Yes. Open any document to read its scope and key limits, then use the download button. Enter your name, business email and purpose, and the PDF will open.
Can you hold limits stricter than these standards?
Often, yes. Send your specification with your inquiry and we confirm in writing which limits we can hold for your order.
Need These for a Supplier Audit?
Send your audit questionnaire or your own specification. We reply within one business day with the documents and test reports that apply to your pouch.